A mesh inquiry that says only “160 gsm, white” leaves important questions unanswered. For an EIFS project, start with the specified wall system and its required reinforcement, then describe the roll you want to buy. Matching a weight or colour is not the same as approving a substitute.
Start with the system, not the roll
Dryvit describes its reinforcing meshes as components used within its base coats, with selection depending on the application. Its guidance also distinguishes reinforcement for higher-impact areas. This illustrates why a purchase specification needs the mesh location and the named system, not just a generic material description. See Dryvit’s reinforcing mesh guidance.
Ask the project’s system provider or responsible designer to confirm the permitted mesh and any proposed substitution. Record that confirmation alongside the product reference. A supplier’s catalogue entry, similar appearance or sample roll should not be treated as system approval.
Make test results comparable
The European Assessment Document EAD 040016-01-0404 (PDF) assesses several separate characteristics of glass fibre mesh for cementitious or cement-based renderings. These include dimensions, mass per area, and tensile strength and elongation in different directions, both initially and after alkaline conditioning. It is a useful reference for understanding what a test report measures; it is not a certificate for a product listed on this website.
For a useful comparison, ask for the test method, specimen width, direction, conditioning procedure and reported units. Keep initial and conditioned results in separate fields. Do not compare two headline tensile values until those conditions match. Likewise, a mass-per-area figure alone cannot establish that a proposed mesh meets the project specification.
Put these fields on the inquiry
- Project context: destination market, named wall system, base coat and the location where the mesh will be used.
- Material reference: specified product or approved equivalent, coating description and required supporting documents.
- Roll dimensions: width, length, mesh opening and agreed tolerances, with units written explicitly.
- Performance evidence: required test method and acceptance criteria, plus the report reference and date for the proposed product.
- Commercial details: quantity, packing format, label requirements, destination and requested delivery schedule.
Leave unknown requirements marked “to be confirmed” instead of copying a value from an unrelated project. Request clarification before comparing quotations; otherwise a lower price may simply represent a different requirement.
Keep the approved sample tied to the order
Use a dated specification and an identifiable sample reference when reviewing a quotation. Record agreed differences in writing, and check the final product reference, packaging and document list against that record before ordering. A visual sample review and a technical performance assessment answer different questions.
For a sourcing discussion, send the specification and any unresolved questions. Available products and documentation must be confirmed for the individual request. This article is a procurement checklist, not an installation method, engineering approval or claim of certification. Refer to the current instructions for the actual system before use.
